YOUR DREAM DECK AWAITS: THE FINAL STEPS TO PROJECT SUCCESS IN PERTH

  • Writer: Mounts Bay Constructions
    Mounts Bay Constructions
  • Jun 13
  • 14 min read








Too busy to read? Listen instead!

Made by Ai









You've made it this far. You know decking will transform your outdoor space. You've chosen your contractor. Now you're standing at the exciting threshold of turning your vision into reality.

This is the moment when anticipation meets action. Soon, you'll be sipping your morning coffee on your new deck, hosting weekend BBQs with friends, or simply enjoying Perth's beautiful evenings in your own outdoor retreat.

But before the first board is cut, there are some final steps that separate successful projects from disappointing ones. This guide will help you cross the finish line with confidence, ensuring your deck project delivers everything you've dreamed of—and more.


The difference between a good deck project and a great one often comes down to the details you sort out in these final weeks. From understanding exactly what's included in your contract to exploring exciting upgrade options that will make your space truly special, every decision you make now will impact your enjoyment for years to come.




WHY YOU MADE THE SMART CHOICE: PROFESSIONAL vs. DIY DECKING


Before we dive into the final details, let's quickly reaffirm why hiring a professional deck builder was the right call. The temptation to save money with DIY is real, but the hidden costs and risks make professional installation the smart choice for most Perth homeowners.


THE PROFESSIONAL ADVANTAGE THAT PAYS OFF

What Matters Most

DIY Reality

Professional Delivery

Long-Term Impact

Time to Completion

2-4 months of weekends

1-3 weeks total

Enjoy your deck this season

Quality Assurance

Learning as you go

Decades of experience

No costly repairs later

Structural Safety

Hope it's built right

Engineering expertise

Peace of mind always

Weather Protection

Fingers crossed

Perth climate knowledge

Deck lasts for decades

Problem Solving

YouTube and stress

Immediate solutions

Smooth project flow

Final Result

"Good enough"

"Better than expected"

Adds real property value

Warranty Coverage

You fix everything

Comprehensive protection

Protected investment

THE HIDDEN COSTS OF DIY THAT ADD UP FAST

Many homeowners underestimate the true cost of DIY decking. Here's what the numbers really look like:

Cost Category

DIY Reality

Professional Advantage

Tool Purchase/Rental

$2,000-$4,000

Included in service

Material Waste

15-20% over-ordering

Precise quantities

Permit Mistakes

$500-$2,000 in fees/delays

Handled expertly

Structural Errors

$3,000-$8,000 to fix

Built right first time

Time Value

60-120 hours of your time

Your weekends back

Stress Factor

Immeasurable

Eliminated

You've chosen expertise over experimentation. Now let's make sure you get the most from that investment.



THE PRE-CONSTRUCTION PHASE: SETTING YOUR PROJECT UP FOR SUCCESS


The weeks before construction begins are crucial. This is when you'll finalize every detail, avoid common pitfalls, and set expectations that ensure a smooth building process.


UNDERSTANDING PERTH's BUILDING REQUIREMENTS


Perth's unique climate and local regulations mean your deck needs to meet specific standards. Here's what your contractor should be handling:

Requirement Type

Perth Specific Considerations

Why It Matters

Wind Loading

Coastal winds up to 100km/h

Structural integrity

Bushfire Ratings

BAL ratings in some areas

Safety and insurance

Drainage Standards

Heavy winter rainfall

Prevents water damage

Setback Requirements

Varies by suburb

Avoids council issues

Height Restrictions

Different for each council

Prevents demolition orders


MATERIAL SELECTION: GETTING WHAT YOU PAY FOR


At this stage, your material choices should be locked in. But it's worth understanding exactly what you're getting:


Premium Hardwood Options for Perth:

Timber Type

Durability Rating

Maintenance Needs

Perth Climate Suitability

Cost Factor

Jarrah

★★★★★

Low-Medium

★★★★★

High

Spotted Gum

★★★★★

Low-Medium

★★★★★

High

Blackbutt

★★★★☆

Medium

★★★★☆

Medium-High

Merbau

★★★★☆

Medium-High

★★★★☆

Medium-High

Treated Pine

★★★☆☆

High

★★★☆☆

Low

Composite Decking Comparison:

Brand Category

Heat Resistance

Fade Resistance

Warranty Period

Perth Suitability

Premium Composite

Excellent

25+ years

25-30 years

★★★★★

Mid-Range Composite

Good

15-20 years

15-20 years

★★★★☆

Budget Composite

Fair

10-15 years

10-15 years

★★★☆☆




FINALISING YOUR PROJECT: THE CRITICAL DETAILS THAT MATTER


You're almost there, but these final steps determine whether your project runs smoothly or hits unnecessary bumps. The contract you sign and the details you confirm now will govern every aspect of your project.


CONTRACT ESSENTIALS: WHAT MUST BE CRYSTAL CLEAR


Before you sign anything, ensure these elements are explicitly detailed. A good contract protects both you and your contractor by setting clear expectations.


Project Scope and Specifications:

  • Exact deck dimensions and layout (to the centimeter)

  • Specific materials (brand, grade, color, batch numbers)

  • Structural specifications and load ratings

  • Included features (railings, stairs, built-ins)

  • Site preparation requirements

  • Cleanup and disposal responsibilities

  • Weather protection measures during construction

Timeline and Milestones:

  • Project start date (and conditions that might delay it)

  • Key milestone dates with specific deliverables

  • Expected completion date with buffer time

  • Weather contingency provisions

  • Communication schedule and reporting methods

  • What happens if delays occur

Financial Terms:

  • Total project cost broken down by category

  • Payment schedule tied to specific milestones

  • Change order procedures and approval process

  • Material cost variation policies

  • Final payment terms and inspection requirements

  • Warranty coverage details

ADVANCED QUESTIIONS TO ASK BEFORE SIGNING

Beyond the basics, these questions reveal your contractor's professionalism and expertise:

About Project Management:

  • "Who will be on-site supervising the work daily?"

  • "How do you coordinate with other trades if electrical or plumbing work is needed?"

  • "What's your process for handling material deliveries and storage?"

  • "How do you protect my property during construction?"

About Quality Control:

  • "What inspections occur at each stage of construction?"

  • "How do you ensure the deck meets or exceeds building standards?"

  • "What happens if you're not satisfied with any aspect of the work?"

  • "Can I see examples of your quality control documentation?"

About Problem Resolution:

  • "What's your process for handling unexpected site conditions?"

  • "How quickly do you respond to concerns during construction?"

  • "What's your policy on fixing issues that arise after completion?"

  • "How do warranty claims get processed and resolved?"


PERMIT AND APPROVAL DEEP DIVE


Your contractor should handle permits, but understanding the process helps you stay informed and avoid delays:

Permit Type

When Required

Processing Time

Cost Range

Your Role

Building Permit

Decks over 1m high or attached

2-6 weeks

$200-$800

Provide property details

Development Approval

Large decks, heritage areas

4-8 weeks

$500-$2,000

Sign applications

Structural Certification

Complex or elevated decks

1-2 weeks

$800-$2,000

Review and approve plans

Electrical Permit

Adding power/lighting

1-2 weeks

$150-$400

Specify requirements

Plumbing Permit

Water features or drainage

2-3 weeks

$200-$600

Approve connections

SITE PREPARATION CHECKLIST


Before construction begins, ensure these items are addressed:


Access and Logistics:

  • Confirm vehicle and equipment access routes

  • Arrange temporary fence removal if necessary

  • Identify material storage areas

  • Plan for waste removal and disposal

  • Notify neighbors about construction schedule

  • Arrange pet and child safety measures

Utilities and Services:

  • Mark underground services (Dial Before You Dig)

  • Identify water and electrical connection points

  • Plan for temporary power if needed

  • Ensure clear access to meter boxes

  • Arrange for any temporary service disruptions



COMMON LAST-MINUTE PITFALLS (AND HOW TO AVOID THEM)


Even at this final stage, small oversights can create big problems. Learning from others' mistakes can save you time, money, and stress.


PITFALL #1: UNCLEAR SCOPE OF WORK


The Problem: Assumptions about what's included lead to disputes later. "I thought the stairs were included" is a common source of tension.


The Solution: Get everything in writing. If it's not in the contract, it's not included. Create a detailed scope document that covers every element.

Red Flag Examples:

  • Contract says "deck construction" but doesn't specify whether stairs to the yard are included

  • "Site preparation" mentioned but excavation depth not specified

  • "Railing installation" noted but style and height not detailed

  • "Electrical rough-in" listed but outlet locations not marked

Prevention Strategy: Ask your contractor to walk through the entire scope item by item, ensuring every component is documented.

PITFALL #2: INADEQUATE SITE ACCESS PLANNING


The Problem: Materials can't reach your backyard, causing delays and extra costs for manual handling or crane hire.


The Solution: Walk through access routes with your contractor before work begins. Measure gate widths, check overhead clearances, and plan protection for existing surfaces.

Consider These Factors:

  • Gate widths (standard gates are 900mm, may need 1200mm+ for materials)

  • Overhead clearances (power lines, tree branches, pergolas)

  • Ground protection (lawn, pavers, driveways)

  • Neighbor considerations (shared driveways, overhanging plants)

  • Equipment access (post hole diggers, concrete mixers, delivery trucks)


PITFALL #3: LAST-MINUTE DESIGN CHANGES


The Problem: "While you're here" additions that blow budgets and timelines. Small changes can have big impacts on structural requirements and material orders.


The Solution: Finalize all design decisions before construction begins. Create a formal change approval process for any modifications.

Change Type

Cost Impact

Schedule Impact

Material Impact

Best Time to Decide

Material Upgrade

10-30% increase

Minimal delay

May need reordering

Before ordering

Size Increase

15-40% increase

1-2 week delay

Significant changes

Design phase

Added Features

Varies widely

3-7 day delay

Additional materials

Planning stage

Layout Changes

20-50% increase

1-3 week delay

Complete reorder

Never during construction

Electrical Additions

$500-$2,000

2-5 day delay

New permits needed

Early planning


PITFALL #4: PAYMENT SCHEDULE MISUNDERSTANDINGS

The Problem: Unclear payment terms create tension and cash flow issues. Know exactly when payments are due and what triggers them.


The Solution: Understand the payment schedule and ensure it's tied to completed milestones, not just time passing.


Industry Standard Schedule:

  • 10% deposit on contract signing (secures materials and schedule)

  • 25% on materials delivery (covers material costs)

  • 35% at frame completion (major structural milestone)

  • 25% at deck completion (before final details)

  • 5% final payment after final inspection (ensures any punch list items are addressed)


PITFALL #5: WEATHER CONTIGENCY OVERSIGHTS


The Problem: Perth's weather can impact construction schedules, especially during winter months or extreme summer heat.


The Solution: Understand how weather affects your project timeline and build in realistic buffers.

Weather Condition

Impact on Construction

Typical Delays

Prevention Strategies

Heavy Rain

Stops most outdoor work

1-3 days

Covered work areas

Extreme Heat (40°C+)

Limits work hours

Half days

Early morning schedules

Strong Winds

Unsafe for elevated work

1-2 days

Flexible scheduling

Extended Wet Period

Can't excavate or concrete

1-2 weeks

Weather monitoring




EXCITING UPGRADES THAT TRANSFORM GOOD DECKS INTO SPECTACULAR SPACES


Now for the fun part! These popular additions can elevate your deck from functional to phenomenal. Since you're already investing in professional construction, now is the perfect time to consider these enhancements.


LIGHTING: EXTEND YOUR ENJOYMENT INTO THE EVENING


Perth's mild nights are perfect for outdoor living. The right lighting transforms your deck into a magical evening retreat.


Lighting Categories and Options:

Lighting Type

Best Uses

Installation Cost

Operating Cost

Wow Factor

LED Strip Under Rails

Safety, ambiance

$300-$800

Very Low

★★★★☆

Recessed Deck Lights

Pathway safety

$500-$1,200

Very Low

★★★☆☆

Pendant Task Lighting

Dining, cooking

$800-$2,000

Low

★★★★★

String Lights

Party atmosphere

$200-$600

Low

★★★★☆

Landscape Uplighting

Drama, security

$1,000-$3,000

Low

★★★★★

Smart Color-Changing

Entertainment

$1,500-$4,000

Low

★★★★★

Advanced Lighting Features:

  • Dimmer controls for mood setting throughout the evening

  • Timer switches that automatically create evening ambiance

  • Smart home integration controllable from your phone

  • Solar options for eco-friendly, off-grid lighting

  • Motion sensors for security and convenience

  • Weather-resistant fixtures designed for Perth's conditions


BUILT-IN FEATURES THAT MAXIMIZE SPACE AND STYLE


Smart built-ins make your deck more functional while creating a custom, high-end appearance.


Seating Solutions:

Seating Type

Space Efficiency

Storage Potential

Comfort Level

Cost Range

Corner Bench with Storage

Excellent

High

Good

$1,200-$2,500

Built-in Dining Banquette

Very Good

Medium

Excellent

$2,000-$4,000

Modular Seating System

Good

Variable

Excellent

$3,000-$6,000

Planter Box Seating

Good

None

Fair

$800-$1,500

Storage and Functional Features:

  • Under-deck storage areas accessible via trapdoors or side panels

  • Built-in barbecue stations with prep space and storage

  • Integrated cooler compartments built into bench seating

  • Tool and equipment storage for pool/garden maintenance

  • Wine storage and serving areas for entertaining

  • Outdoor kitchen prep areas with running water and power


WEATHER PROTECTION: YEAR-ROUND COMFORT


Perth's climate is generally great for outdoor living, but smart weather protection extends your deck's usability even further.


Comprehensive Weather Protection Options:

Protection Type

Sun Protection

Rain Protection

Wind Protection

Year-Round Use

Investment Range

Fixed Timber Pergola

★★★☆☆

★☆☆☆☆

★☆☆☆☆

★★☆☆☆

$8,000-$15,000

Louvered Roof System

★★★★★

★★★★★

★★★☆☆

★★★★★

$15,000-$30,000

Retractable Awning

★★★★☆

★★☆☆☆

★★☆☆☆

★★★☆☆

$3,000-$8,000

Glass Windbreaks

★☆☆☆☆

★☆☆☆☆

★★★★★

★★★★☆

$2,000-$6,000

Outdoor Blinds/Screens

★★★☆☆

★★★☆☆

★★★★☆

★★★★☆

$1,500-$5,000

Complete Enclosure

★★★★★

★★★★★

★★★★★

★★★★★

$20,000-$40,000

Smart Weather Features:

  • Automatic rain sensors that close louvered roofs when rain starts

  • Wind sensors that retract awnings in strong winds

  • Temperature controls that adjust ventilation automatically

  • Remote operation for all weather protection elements


TECHNOLOGY INTEGRATION FOR MODERN LIVING


Today's decks can be equipped with technology that enhances comfort, entertainment, and convenience.


Entertainment and Communication:

Technology

Functionality

Installation Complexity

Ongoing Value

Cost Range

Outdoor TV/Projector

Movies, sports, streaming

Medium

High

$2,000-$8,000

Weather-Resistant Audio

Music, podcasts

Low

High

$1,000-$4,000

WiFi Extension

Internet coverage

Low

High

$200-$800

Security Cameras

Property protection

Medium

High

$800-$2,500

Intercom Systems

House-to-deck communication

Medium

Medium

$500-$1,500

Comfort and Convenience:

  • Outdoor ceiling fans with weather-resistant motors

  • Misting systems for cooling on extreme heat days

  • Outdoor heaters (electric or gas) for cool evenings

  • Automated shade systems that respond to sun position

  • USB charging stations built into railings or furniture

  • Wireless device charging pads integrated into surfaces


COOKING AND DINING ENHANCEMENTS


Transform your deck into a complete outdoor kitchen and dining experience.


Outdoor Cooking Options:

Cooking Setup

Functionality

Space Required

Installation Needs

Investment Level

Built-in BBQ

Grilling, some storage

2m x 1m

Gas line, power

$3,000-$8,000

Outdoor Kitchen

Full cooking capability

3m x 2m

Plumbing, electrical

$10,000-$25,000

Pizza Oven

Specialty cooking

2m x 2m

Gas or wood supply

$5,000-$15,000

Smoker Station

Low, slow cooking

1.5m x 1.5m

Power, ventilation

$2,000-$6,000

Mobile Bar Cart

Drinks, light prep

Flexible

Minimal

$500-$2,000




THE MOUNTS BAY DIFFERENCE: WHY PERTH HOMEOWNERS CHOOSE US


When you're ready to move forward with your deck project, you want a team that understands Perth's unique conditions and delivers exceptional results every time.


OUR COMPREHENSIVE APPROACH


Pre-Construction Excellence:

  • Detailed site analysis including soil conditions, drainage patterns, and access routes

  • 3D design visualization so you can see exactly what you're getting

  • Material sourcing from premium suppliers with established Perth relationships

  • Complete permit handling including all council liaisons and inspections

  • Timeline planning with realistic milestones and weather contingencies

Construction Phase Management:

  • Daily site supervision by experienced project managers

  • Quality control checkpoints at every critical stage

  • Regular communication updates via your preferred method

  • Clean, safe work sites with proper protection for your property

  • Flexible scheduling to minimize disruption to your routine

Post-Completion Support:

  • Comprehensive final inspection with detailed walkthrough

  • Complete maintenance guidelines specific to your materials and design

  • Warranty registration and ongoing support procedures

  • Relationship continuation for future projects and maintenance needs

WHAT SETS MOUNTS BAY APART


Deep Local Perth Expertise:

  • Understanding Perth's microclimates from coastal areas to hills districts

  • Established supplier relationships for premium materials at competitive prices

  • Council relationship management across all Perth metropolitan areas

  • Proven track record with over 500 successful deck projects locally

  • Climate-specific design knowledge that ensures long-term performance


Quality and Craftsmanship Standards:

  • Premium material selection suited specifically to Perth conditions

  • Skilled craftspeople with decades of combined experience

  • Rigorous quality control with multiple inspection points

  • Comprehensive warranties on both materials and workmanship

  • Insurance coverage that protects your investment completely


Communication and Service Excellence:

  • Transparent pricing with detailed breakdowns and no hidden costs

  • Responsive communication with same-day response to questions

  • Honest advice about options, upgrades, and budget considerations

  • Project documentation including photos and specifications

  • Long-term relationship focus extending well beyond project completion




UPGRADE OPTIONS: MAXIMIZING YOUR INVESTMENT


Since you're making this significant investment in your outdoor living space, consider these additions that can dramatically enhance both your enjoyment and your property value.


IMMEDIATE ADD-ONS DURING CONSTRUCTION


Electrical Infrastructure Planning:

  • Multiple power outlets strategically placed for appliances and lighting

  • Dedicated BBQ power circuits with appropriate amperage for large units

  • USB charging stations built into railings or seating areas

  • Landscape lighting circuits with timer and dimmer controls

  • Smart home integration wiring for future automation upgrades

  • Emergency power disconnects for safety and code compliance


Plumbing Preparations:

  • Water connections for outdoor kitchens, bars, or cleaning stations

  • Drainage systems for future pergola guttering or water features

  • Gas lines for barbecues, heaters, or fire features

  • Hose connections positioned for easy deck and plant maintenance

  • Waste water drainage for sinks or ice maker drains


FUTURE-READY INFRASTRUCTURE


Structural Provisions for Expansion:

  • Reinforcement for future pergola installation including proper footings and attachment points

  • Electrical conduits for adding lighting, fans, or entertainment systems later

  • Mounting points for shade sails, screens, or privacy features

  • Drainage systems that accommodate future expansions or modifications

  • Access panels for utility connections and maintenance

  • Load-bearing considerations for heavy future additions like hot tubs or large planters


VALUE-ADDING FEATURES BY BUDGET LEVEL


Budget-Conscious Upgrades ($1,000-$3,000):

  • LED strip lighting under railings

  • Built-in planter boxes

  • Simple pergola structure

  • Basic outdoor electrical outlets

  • Weather-resistant ceiling fan


Mid-Range Enhancements ($3,000-$8,000):

  • Comprehensive lighting package with dimmers

  • Built-in seating with storage

  • Retractable awning system

  • Outdoor kitchen prep area

  • Sound system installation

Premium Additions ($8,000+):

  • Louvered roof system with automation

  • Complete outdoor kitchen

  • Smart home integration

  • High-end entertainment system

  • Custom water features


TIMELINE MANAGEMENT: WHAT TO EXPECT


Understanding the construction timeline helps you plan around the work and manage expectations for completion.


DETAILED PROJECT PHASES

Phase

Duration

Weather Dependency

Your Involvement

Key Milestones

Pre-Construction

1-2 weeks

None

High

Permits, final approvals

Site Preparation

1-2 days

Medium

Low

Excavation, marking

Foundation/Footings

2-3 days

High

None

Concrete pour, curing

Frame Construction

3-5 days

Medium

Low

Structure completion

Decking Installation

2-4 days

Low

None

Surface completion

Railings & Features

2-3 days

Low

Medium

Safety, aesthetics

Final Details

1-2 days

Low

High

Cleanup, inspection

MANAGING DISRUPTION DURING CONSTRUCTION


Daily Life Considerations:

  • Work hours typically 7:00 AM to 5:00 PM on weekdays

  • Noise levels moderate during framing, minimal during finishing

  • Access requirements to backyard, sometimes through house

  • Pet safety arrangements during construction phases

  • Parking considerations for worker vehicles and material deliveries


INVESTMENT PROTECTION: UNDERSTANDING YOUR WARRANTIES


Your deck represents a significant investment, and comprehensive warranty coverage protects that investment for years to come.


WARRANTY COVERAGE BREAKDOWN

Component

Coverage Period

What's Included

What's Excluded

Structural Elements

10 years

Frame, footings, load-bearing components

Normal wear, abuse

Decking Surface

5-25 years*

Material defects, premature failure

Maintenance neglect

Railings & Hardware

5 years

Manufacturing defects, installation

Weather-related wear

Electrical Work

5 years

Installation, components

Fixture replacements

Workmanship

2 years

Installation quality, fit and finish

Design changes requested

*Warranty period depends on material choice - composite longer than natural timber


MAINTENANCE REQUIREMENTS FOR WARRANTY VALIDITY


Annual Maintenance Tasks:

  • Visual inspection for loose fasteners or damaged boards

  • Cleaning with appropriate products for your decking material

  • Clearing drainage areas of debris and vegetation

  • Inspection and cleaning of electrical fixtures and connections

  • Documentation of maintenance activities for warranty records




READY TO START BUILDING YOUR DREAM DECK?


You've done everything right. You've researched your options, chosen quality materials, and selected an experienced contractor. Now it's time to make it official and start the exciting journey to your new outdoor living space.


The transformation you're about to experience goes beyond just adding square meters to your home. You're creating a new lifestyle centered around outdoor living, entertainment, and relaxation. Your deck will become the gathering place for family meals, weekend celebrations, quiet morning coffees, and evening conversations under the stars.


YOUR NEXT STEPS


1. Schedule Your Final Design Consultation: Let's review your plans one more time, discuss any final upgrade options, and ensure every detail is perfect before we begin. This is your opportunity to visualize the completed project and make any last refinements to ensure it exceeds your expectations.


2. Finalize Your Contract: We'll walk through every aspect of your project timeline, specifications, and expectations to ensure complete clarity. You'll understand exactly what's happening when, what to expect at each stage, and how we'll communicate throughout the process.


3. Secure Your Start Date: Perth's great weather means deck building season is year-round, but our schedule fills up quickly, especially during peak renovation seasons. Let's lock in your preferred timeframe and ensure your project gets the dedicated attention it deserves.


4. Get Excited: Soon you'll be enjoying your new deck, wondering why you waited so long to make this investment in your lifestyle. The anticipation is almost over – your outdoor oasis is about to become reality.


START YOUR PROJECT TODAY


Don't let another Perth summer pass without the outdoor space you've been planning. Your dream deck is just a phone call away, and every day you delay is another day you're not enjoying the outdoor lifestyle Perth is famous for.


Ready to Begin?


📞 Call Mounts Bay Carpentry & Construction for your final design consultation and contract finalization

📧 Email us to discuss your specific requirements, timeline, and any last-minute questions

🏡 Visit our showroom to see material samples, completed projects, and discuss upgrade options 💬 Book online for a convenient consultation time that works with your schedule

🎯 Request a detailed quote with all specifications and upgrade options included


WHY START N?


Seasonal Advantages:

  • Perth's mild weather allows year-round construction

  • Earlier start means enjoying your deck for more of the good weather

  • Material availability is best when you're not competing with peak season demand

  • Our schedule allows more flexibility for custom features and upgrades


Financial Benefits:

  • Lock in current pricing before any material cost increases

  • Spread payment schedule over construction period

  • Start adding value to your property immediately

  • Take advantage of any current promotions or package deals


WHY WAIT? YOUR OUTDOOR OASIS AWAITS


Every day you delay is another day you're not enjoying your perfect outdoor space. Perth's lifestyle is made for alfresco living, and your new deck will be the foundation for years of memories with family and friends.


The planning is done. The decisions are made. The excitement is building. Now it's time to turn your vision into reality.


Contact Mounts Bay Carpentry & Construction today – your dream deck starts here.


Ready to transform your backyard into the entertainment space you've always wanted? Contact our Perth decking specialists now to finalize your project details and secure your construction schedule. Your perfect outdoor living area is closer than you think, and the memories you'll create there will last a lifetime.


 
 
 