YOUR DREAM DECK AWAITS: THE FINAL STEPS TO PROJECT SUCCESS IN PERTH
- Mounts Bay Constructions
- Jun 13
- 14 min read
Too busy to read? Listen instead!
Made by Ai
You've made it this far. You know decking will transform your outdoor space. You've chosen your contractor. Now you're standing at the exciting threshold of turning your vision into reality.
This is the moment when anticipation meets action. Soon, you'll be sipping your morning coffee on your new deck, hosting weekend BBQs with friends, or simply enjoying Perth's beautiful evenings in your own outdoor retreat.
But before the first board is cut, there are some final steps that separate successful projects from disappointing ones. This guide will help you cross the finish line with confidence, ensuring your deck project delivers everything you've dreamed of—and more.
The difference between a good deck project and a great one often comes down to the details you sort out in these final weeks. From understanding exactly what's included in your contract to exploring exciting upgrade options that will make your space truly special, every decision you make now will impact your enjoyment for years to come.

WHY YOU MADE THE SMART CHOICE: PROFESSIONAL vs. DIY DECKING
Before we dive into the final details, let's quickly reaffirm why hiring a professional deck builder was the right call. The temptation to save money with DIY is real, but the hidden costs and risks make professional installation the smart choice for most Perth homeowners.
THE PROFESSIONAL ADVANTAGE THAT PAYS OFF
What Matters Most | DIY Reality | Professional Delivery | Long-Term Impact |
Time to Completion | 2-4 months of weekends | 1-3 weeks total | Enjoy your deck this season |
Quality Assurance | Learning as you go | Decades of experience | No costly repairs later |
Structural Safety | Hope it's built right | Engineering expertise | Peace of mind always |
Weather Protection | Fingers crossed | Perth climate knowledge | Deck lasts for decades |
Problem Solving | YouTube and stress | Immediate solutions | Smooth project flow |
Final Result | "Good enough" | "Better than expected" | Adds real property value |
Warranty Coverage | You fix everything | Comprehensive protection | Protected investment |
THE HIDDEN COSTS OF DIY THAT ADD UP FAST
Many homeowners underestimate the true cost of DIY decking. Here's what the numbers really look like:
Cost Category | DIY Reality | Professional Advantage |
Tool Purchase/Rental | $2,000-$4,000 | Included in service |
Material Waste | 15-20% over-ordering | Precise quantities |
Permit Mistakes | $500-$2,000 in fees/delays | Handled expertly |
Structural Errors | $3,000-$8,000 to fix | Built right first time |
Time Value | 60-120 hours of your time | Your weekends back |
Stress Factor | Immeasurable | Eliminated |
You've chosen expertise over experimentation. Now let's make sure you get the most from that investment.
THE PRE-CONSTRUCTION PHASE: SETTING YOUR PROJECT UP FOR SUCCESS
The weeks before construction begins are crucial. This is when you'll finalize every detail, avoid common pitfalls, and set expectations that ensure a smooth building process.
UNDERSTANDING PERTH's BUILDING REQUIREMENTS
Perth's unique climate and local regulations mean your deck needs to meet specific standards. Here's what your contractor should be handling:
Requirement Type | Perth Specific Considerations | Why It Matters |
Wind Loading | Coastal winds up to 100km/h | Structural integrity |
Bushfire Ratings | BAL ratings in some areas | Safety and insurance |
Drainage Standards | Heavy winter rainfall | Prevents water damage |
Setback Requirements | Varies by suburb | Avoids council issues |
Height Restrictions | Different for each council | Prevents demolition orders |
MATERIAL SELECTION: GETTING WHAT YOU PAY FOR
At this stage, your material choices should be locked in. But it's worth understanding exactly what you're getting:
Premium Hardwood Options for Perth:
Timber Type | Durability Rating | Maintenance Needs | Perth Climate Suitability | Cost Factor |
Jarrah | ★★★★★ | Low-Medium | ★★★★★ | High |
Spotted Gum | ★★★★★ | Low-Medium | ★★★★★ | High |
Blackbutt | ★★★★☆ | Medium | ★★★★☆ | Medium-High |
Merbau | ★★★★☆ | Medium-High | ★★★★☆ | Medium-High |
Treated Pine | ★★★☆☆ | High | ★★★☆☆ | Low |
Composite Decking Comparison:
Brand Category | Heat Resistance | Fade Resistance | Warranty Period | Perth Suitability |
Premium Composite | Excellent | 25+ years | 25-30 years | ★★★★★ |
Mid-Range Composite | Good | 15-20 years | 15-20 years | ★★★★☆ |
Budget Composite | Fair | 10-15 years | 10-15 years | ★★★☆☆ |

FINALISING YOUR PROJECT: THE CRITICAL DETAILS THAT MATTER
You're almost there, but these final steps determine whether your project runs smoothly or hits unnecessary bumps. The contract you sign and the details you confirm now will govern every aspect of your project.
CONTRACT ESSENTIALS: WHAT MUST BE CRYSTAL CLEAR
Before you sign anything, ensure these elements are explicitly detailed. A good contract protects both you and your contractor by setting clear expectations.
Project Scope and Specifications:
Exact deck dimensions and layout (to the centimeter)
Specific materials (brand, grade, color, batch numbers)
Structural specifications and load ratings
Included features (railings, stairs, built-ins)
Site preparation requirements
Cleanup and disposal responsibilities
Weather protection measures during construction
Timeline and Milestones:
Project start date (and conditions that might delay it)
Key milestone dates with specific deliverables
Expected completion date with buffer time
Weather contingency provisions
Communication schedule and reporting methods
What happens if delays occur
Financial Terms:
Total project cost broken down by category
Payment schedule tied to specific milestones
Change order procedures and approval process
Material cost variation policies
Final payment terms and inspection requirements
Warranty coverage details
ADVANCED QUESTIIONS TO ASK BEFORE SIGNING
Beyond the basics, these questions reveal your contractor's professionalism and expertise:
About Project Management:
"Who will be on-site supervising the work daily?"
"How do you coordinate with other trades if electrical or plumbing work is needed?"
"What's your process for handling material deliveries and storage?"
"How do you protect my property during construction?"
About Quality Control:
"What inspections occur at each stage of construction?"
"How do you ensure the deck meets or exceeds building standards?"
"What happens if you're not satisfied with any aspect of the work?"
"Can I see examples of your quality control documentation?"
About Problem Resolution:
"What's your process for handling unexpected site conditions?"
"How quickly do you respond to concerns during construction?"
"What's your policy on fixing issues that arise after completion?"
"How do warranty claims get processed and resolved?"
PERMIT AND APPROVAL DEEP DIVE
Your contractor should handle permits, but understanding the process helps you stay informed and avoid delays:
Permit Type | When Required | Processing Time | Cost Range | Your Role |
Building Permit | Decks over 1m high or attached | 2-6 weeks | $200-$800 | Provide property details |
Development Approval | Large decks, heritage areas | 4-8 weeks | $500-$2,000 | Sign applications |
Structural Certification | Complex or elevated decks | 1-2 weeks | $800-$2,000 | Review and approve plans |
Electrical Permit | Adding power/lighting | 1-2 weeks | $150-$400 | Specify requirements |
Plumbing Permit | Water features or drainage | 2-3 weeks | $200-$600 | Approve connections |
SITE PREPARATION CHECKLIST
Before construction begins, ensure these items are addressed:
Access and Logistics:
Confirm vehicle and equipment access routes
Arrange temporary fence removal if necessary
Identify material storage areas
Plan for waste removal and disposal
Notify neighbors about construction schedule
Arrange pet and child safety measures
Utilities and Services:
Mark underground services (Dial Before You Dig)
Identify water and electrical connection points
Plan for temporary power if needed
Ensure clear access to meter boxes
Arrange for any temporary service disruptions

COMMON LAST-MINUTE PITFALLS (AND HOW TO AVOID THEM)
Even at this final stage, small oversights can create big problems. Learning from others' mistakes can save you time, money, and stress.
PITFALL #1: UNCLEAR SCOPE OF WORK
The Problem: Assumptions about what's included lead to disputes later. "I thought the stairs were included" is a common source of tension.
The Solution: Get everything in writing. If it's not in the contract, it's not included. Create a detailed scope document that covers every element.
Red Flag Examples:
Contract says "deck construction" but doesn't specify whether stairs to the yard are included
"Site preparation" mentioned but excavation depth not specified
"Railing installation" noted but style and height not detailed
"Electrical rough-in" listed but outlet locations not marked
Prevention Strategy: Ask your contractor to walk through the entire scope item by item, ensuring every component is documented.
PITFALL #2: INADEQUATE SITE ACCESS PLANNING
The Problem: Materials can't reach your backyard, causing delays and extra costs for manual handling or crane hire.
The Solution: Walk through access routes with your contractor before work begins. Measure gate widths, check overhead clearances, and plan protection for existing surfaces.
Consider These Factors:
Gate widths (standard gates are 900mm, may need 1200mm+ for materials)
Overhead clearances (power lines, tree branches, pergolas)
Ground protection (lawn, pavers, driveways)
Neighbor considerations (shared driveways, overhanging plants)
Equipment access (post hole diggers, concrete mixers, delivery trucks)
PITFALL #3: LAST-MINUTE DESIGN CHANGES
The Problem: "While you're here" additions that blow budgets and timelines. Small changes can have big impacts on structural requirements and material orders.
The Solution: Finalize all design decisions before construction begins. Create a formal change approval process for any modifications.
Change Type | Cost Impact | Schedule Impact | Material Impact | Best Time to Decide |
Material Upgrade | 10-30% increase | Minimal delay | May need reordering | Before ordering |
Size Increase | 15-40% increase | 1-2 week delay | Significant changes | Design phase |
Added Features | Varies widely | 3-7 day delay | Additional materials | Planning stage |
Layout Changes | 20-50% increase | 1-3 week delay | Complete reorder | Never during construction |
Electrical Additions | $500-$2,000 | 2-5 day delay | New permits needed | Early planning |
PITFALL #4: PAYMENT SCHEDULE MISUNDERSTANDINGS
The Problem: Unclear payment terms create tension and cash flow issues. Know exactly when payments are due and what triggers them.
The Solution: Understand the payment schedule and ensure it's tied to completed milestones, not just time passing.
Industry Standard Schedule:
10% deposit on contract signing (secures materials and schedule)
25% on materials delivery (covers material costs)
35% at frame completion (major structural milestone)
25% at deck completion (before final details)
5% final payment after final inspection (ensures any punch list items are addressed)
PITFALL #5: WEATHER CONTIGENCY OVERSIGHTS
The Problem: Perth's weather can impact construction schedules, especially during winter months or extreme summer heat.
The Solution: Understand how weather affects your project timeline and build in realistic buffers.
Weather Condition | Impact on Construction | Typical Delays | Prevention Strategies |
Heavy Rain | Stops most outdoor work | 1-3 days | Covered work areas |
Extreme Heat (40°C+) | Limits work hours | Half days | Early morning schedules |
Strong Winds | Unsafe for elevated work | 1-2 days | Flexible scheduling |
Extended Wet Period | Can't excavate or concrete | 1-2 weeks | Weather monitoring |

EXCITING UPGRADES THAT TRANSFORM GOOD DECKS INTO SPECTACULAR SPACES
Now for the fun part! These popular additions can elevate your deck from functional to phenomenal. Since you're already investing in professional construction, now is the perfect time to consider these enhancements.
LIGHTING: EXTEND YOUR ENJOYMENT INTO THE EVENING
Perth's mild nights are perfect for outdoor living. The right lighting transforms your deck into a magical evening retreat.
Lighting Categories and Options:
Lighting Type | Best Uses | Installation Cost | Operating Cost | Wow Factor |
LED Strip Under Rails | Safety, ambiance | $300-$800 | Very Low | ★★★★☆ |
Recessed Deck Lights | Pathway safety | $500-$1,200 | Very Low | ★★★☆☆ |
Pendant Task Lighting | Dining, cooking | $800-$2,000 | Low | ★★★★★ |
String Lights | Party atmosphere | $200-$600 | Low | ★★★★☆ |
Landscape Uplighting | Drama, security | $1,000-$3,000 | Low | ★★★★★ |
Smart Color-Changing | Entertainment | $1,500-$4,000 | Low | ★★★★★ |
Advanced Lighting Features:
Dimmer controls for mood setting throughout the evening
Timer switches that automatically create evening ambiance
Smart home integration controllable from your phone
Solar options for eco-friendly, off-grid lighting
Motion sensors for security and convenience
Weather-resistant fixtures designed for Perth's conditions
BUILT-IN FEATURES THAT MAXIMIZE SPACE AND STYLE
Smart built-ins make your deck more functional while creating a custom, high-end appearance.
Seating Solutions:
Seating Type | Space Efficiency | Storage Potential | Comfort Level | Cost Range |
Corner Bench with Storage | Excellent | High | Good | $1,200-$2,500 |
Built-in Dining Banquette | Very Good | Medium | Excellent | $2,000-$4,000 |
Modular Seating System | Good | Variable | Excellent | $3,000-$6,000 |
Planter Box Seating | Good | None | Fair | $800-$1,500 |
Storage and Functional Features:
Under-deck storage areas accessible via trapdoors or side panels
Built-in barbecue stations with prep space and storage
Integrated cooler compartments built into bench seating
Tool and equipment storage for pool/garden maintenance
Wine storage and serving areas for entertaining
Outdoor kitchen prep areas with running water and power
WEATHER PROTECTION: YEAR-ROUND COMFORT
Perth's climate is generally great for outdoor living, but smart weather protection extends your deck's usability even further.
Comprehensive Weather Protection Options:
Protection Type | Sun Protection | Rain Protection | Wind Protection | Year-Round Use | Investment Range |
Fixed Timber Pergola | ★★★☆☆ | ★☆☆☆☆ | ★☆☆☆☆ | ★★☆☆☆ | $8,000-$15,000 |
Louvered Roof System | ★★★★★ | ★★★★★ | ★★★☆☆ | ★★★★★ | $15,000-$30,000 |
Retractable Awning | ★★★★☆ | ★★☆☆☆ | ★★☆☆☆ | ★★★☆☆ | $3,000-$8,000 |
Glass Windbreaks | ★☆☆☆☆ | ★☆☆☆☆ | ★★★★★ | ★★★★☆ | $2,000-$6,000 |
Outdoor Blinds/Screens | ★★★☆☆ | ★★★☆☆ | ★★★★☆ | ★★★★☆ | $1,500-$5,000 |
Complete Enclosure | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ | $20,000-$40,000 |
Smart Weather Features:
Automatic rain sensors that close louvered roofs when rain starts
Wind sensors that retract awnings in strong winds
Temperature controls that adjust ventilation automatically
Remote operation for all weather protection elements
TECHNOLOGY INTEGRATION FOR MODERN LIVING
Today's decks can be equipped with technology that enhances comfort, entertainment, and convenience.
Entertainment and Communication:
Technology | Functionality | Installation Complexity | Ongoing Value | Cost Range |
Outdoor TV/Projector | Movies, sports, streaming | Medium | High | $2,000-$8,000 |
Weather-Resistant Audio | Music, podcasts | Low | High | $1,000-$4,000 |
WiFi Extension | Internet coverage | Low | High | $200-$800 |
Security Cameras | Property protection | Medium | High | $800-$2,500 |
Intercom Systems | House-to-deck communication | Medium | Medium | $500-$1,500 |
Comfort and Convenience:
Outdoor ceiling fans with weather-resistant motors
Misting systems for cooling on extreme heat days
Outdoor heaters (electric or gas) for cool evenings
Automated shade systems that respond to sun position
USB charging stations built into railings or furniture
Wireless device charging pads integrated into surfaces
COOKING AND DINING ENHANCEMENTS
Transform your deck into a complete outdoor kitchen and dining experience.
Outdoor Cooking Options:
Cooking Setup | Functionality | Space Required | Installation Needs | Investment Level |
Built-in BBQ | Grilling, some storage | 2m x 1m | Gas line, power | $3,000-$8,000 |
Outdoor Kitchen | Full cooking capability | 3m x 2m | Plumbing, electrical | $10,000-$25,000 |
Pizza Oven | Specialty cooking | 2m x 2m | Gas or wood supply | $5,000-$15,000 |
Smoker Station | Low, slow cooking | 1.5m x 1.5m | Power, ventilation | $2,000-$6,000 |
Mobile Bar Cart | Drinks, light prep | Flexible | Minimal | $500-$2,000 |

THE MOUNTS BAY DIFFERENCE: WHY PERTH HOMEOWNERS CHOOSE US
When you're ready to move forward with your deck project, you want a team that understands Perth's unique conditions and delivers exceptional results every time.
OUR COMPREHENSIVE APPROACH
Pre-Construction Excellence:
Detailed site analysis including soil conditions, drainage patterns, and access routes
3D design visualization so you can see exactly what you're getting
Material sourcing from premium suppliers with established Perth relationships
Complete permit handling including all council liaisons and inspections
Timeline planning with realistic milestones and weather contingencies
Construction Phase Management:
Daily site supervision by experienced project managers
Quality control checkpoints at every critical stage
Regular communication updates via your preferred method
Clean, safe work sites with proper protection for your property
Flexible scheduling to minimize disruption to your routine
Post-Completion Support:
Comprehensive final inspection with detailed walkthrough
Complete maintenance guidelines specific to your materials and design
Warranty registration and ongoing support procedures
Relationship continuation for future projects and maintenance needs
WHAT SETS MOUNTS BAY APART
Deep Local Perth Expertise:
Understanding Perth's microclimates from coastal areas to hills districts
Established supplier relationships for premium materials at competitive prices
Council relationship management across all Perth metropolitan areas
Proven track record with over 500 successful deck projects locally
Climate-specific design knowledge that ensures long-term performance
Quality and Craftsmanship Standards:
Premium material selection suited specifically to Perth conditions
Skilled craftspeople with decades of combined experience
Rigorous quality control with multiple inspection points
Comprehensive warranties on both materials and workmanship
Insurance coverage that protects your investment completely
Communication and Service Excellence:
Transparent pricing with detailed breakdowns and no hidden costs
Responsive communication with same-day response to questions
Honest advice about options, upgrades, and budget considerations
Project documentation including photos and specifications
Long-term relationship focus extending well beyond project completion

UPGRADE OPTIONS: MAXIMIZING YOUR INVESTMENT
Since you're making this significant investment in your outdoor living space, consider these additions that can dramatically enhance both your enjoyment and your property value.
IMMEDIATE ADD-ONS DURING CONSTRUCTION
Electrical Infrastructure Planning:
Multiple power outlets strategically placed for appliances and lighting
Dedicated BBQ power circuits with appropriate amperage for large units
USB charging stations built into railings or seating areas
Landscape lighting circuits with timer and dimmer controls
Smart home integration wiring for future automation upgrades
Emergency power disconnects for safety and code compliance
Plumbing Preparations:
Water connections for outdoor kitchens, bars, or cleaning stations
Drainage systems for future pergola guttering or water features
Gas lines for barbecues, heaters, or fire features
Hose connections positioned for easy deck and plant maintenance
Waste water drainage for sinks or ice maker drains
FUTURE-READY INFRASTRUCTURE
Structural Provisions for Expansion:
Reinforcement for future pergola installation including proper footings and attachment points
Electrical conduits for adding lighting, fans, or entertainment systems later
Mounting points for shade sails, screens, or privacy features
Drainage systems that accommodate future expansions or modifications
Access panels for utility connections and maintenance
Load-bearing considerations for heavy future additions like hot tubs or large planters
VALUE-ADDING FEATURES BY BUDGET LEVEL
Budget-Conscious Upgrades ($1,000-$3,000):
LED strip lighting under railings
Built-in planter boxes
Simple pergola structure
Basic outdoor electrical outlets
Weather-resistant ceiling fan
Mid-Range Enhancements ($3,000-$8,000):
Comprehensive lighting package with dimmers
Built-in seating with storage
Retractable awning system
Outdoor kitchen prep area
Sound system installation
Premium Additions ($8,000+):
Louvered roof system with automation
Complete outdoor kitchen
Smart home integration
High-end entertainment system
Custom water features
TIMELINE MANAGEMENT: WHAT TO EXPECT
Understanding the construction timeline helps you plan around the work and manage expectations for completion.
DETAILED PROJECT PHASES
Phase | Duration | Weather Dependency | Your Involvement | Key Milestones |
Pre-Construction | 1-2 weeks | None | High | Permits, final approvals |
Site Preparation | 1-2 days | Medium | Low | Excavation, marking |
Foundation/Footings | 2-3 days | High | None | Concrete pour, curing |
Frame Construction | 3-5 days | Medium | Low | Structure completion |
Decking Installation | 2-4 days | Low | None | Surface completion |
Railings & Features | 2-3 days | Low | Medium | Safety, aesthetics |
Final Details | 1-2 days | Low | High | Cleanup, inspection |
MANAGING DISRUPTION DURING CONSTRUCTION
Daily Life Considerations:
Work hours typically 7:00 AM to 5:00 PM on weekdays
Noise levels moderate during framing, minimal during finishing
Access requirements to backyard, sometimes through house
Pet safety arrangements during construction phases
Parking considerations for worker vehicles and material deliveries
INVESTMENT PROTECTION: UNDERSTANDING YOUR WARRANTIES
Your deck represents a significant investment, and comprehensive warranty coverage protects that investment for years to come.
WARRANTY COVERAGE BREAKDOWN
Component | Coverage Period | What's Included | What's Excluded |
Structural Elements | 10 years | Frame, footings, load-bearing components | Normal wear, abuse |
Decking Surface | 5-25 years* | Material defects, premature failure | Maintenance neglect |
Railings & Hardware | 5 years | Manufacturing defects, installation | Weather-related wear |
Electrical Work | 5 years | Installation, components | Fixture replacements |
Workmanship | 2 years | Installation quality, fit and finish | Design changes requested |
*Warranty period depends on material choice - composite longer than natural timber
MAINTENANCE REQUIREMENTS FOR WARRANTY VALIDITY
Annual Maintenance Tasks:
Visual inspection for loose fasteners or damaged boards
Cleaning with appropriate products for your decking material
Clearing drainage areas of debris and vegetation
Inspection and cleaning of electrical fixtures and connections
Documentation of maintenance activities for warranty records

READY TO START BUILDING YOUR DREAM DECK?
You've done everything right. You've researched your options, chosen quality materials, and selected an experienced contractor. Now it's time to make it official and start the exciting journey to your new outdoor living space.
The transformation you're about to experience goes beyond just adding square meters to your home. You're creating a new lifestyle centered around outdoor living, entertainment, and relaxation. Your deck will become the gathering place for family meals, weekend celebrations, quiet morning coffees, and evening conversations under the stars.
YOUR NEXT STEPS
1. Schedule Your Final Design Consultation: Let's review your plans one more time, discuss any final upgrade options, and ensure every detail is perfect before we begin. This is your opportunity to visualize the completed project and make any last refinements to ensure it exceeds your expectations.
2. Finalize Your Contract: We'll walk through every aspect of your project timeline, specifications, and expectations to ensure complete clarity. You'll understand exactly what's happening when, what to expect at each stage, and how we'll communicate throughout the process.
3. Secure Your Start Date: Perth's great weather means deck building season is year-round, but our schedule fills up quickly, especially during peak renovation seasons. Let's lock in your preferred timeframe and ensure your project gets the dedicated attention it deserves.
4. Get Excited: Soon you'll be enjoying your new deck, wondering why you waited so long to make this investment in your lifestyle. The anticipation is almost over – your outdoor oasis is about to become reality.
START YOUR PROJECT TODAY
Don't let another Perth summer pass without the outdoor space you've been planning. Your dream deck is just a phone call away, and every day you delay is another day you're not enjoying the outdoor lifestyle Perth is famous for.
Ready to Begin?
📞 Call Mounts Bay Carpentry & Construction for your final design consultation and contract finalization
📧 Email us to discuss your specific requirements, timeline, and any last-minute questions
🏡 Visit our showroom to see material samples, completed projects, and discuss upgrade options 💬 Book online for a convenient consultation time that works with your schedule
🎯 Request a detailed quote with all specifications and upgrade options included
WHY START N?
Seasonal Advantages:
Perth's mild weather allows year-round construction
Earlier start means enjoying your deck for more of the good weather
Material availability is best when you're not competing with peak season demand
Our schedule allows more flexibility for custom features and upgrades
Financial Benefits:
Lock in current pricing before any material cost increases
Spread payment schedule over construction period
Start adding value to your property immediately
Take advantage of any current promotions or package deals
WHY WAIT? YOUR OUTDOOR OASIS AWAITS
Every day you delay is another day you're not enjoying your perfect outdoor space. Perth's lifestyle is made for alfresco living, and your new deck will be the foundation for years of memories with family and friends.
The planning is done. The decisions are made. The excitement is building. Now it's time to turn your vision into reality.
Contact Mounts Bay Carpentry & Construction today – your dream deck starts here.
Ready to transform your backyard into the entertainment space you've always wanted? Contact our Perth decking specialists now to finalize your project details and secure your construction schedule. Your perfect outdoor living area is closer than you think, and the memories you'll create there will last a lifetime.